Site Profile(as of March 31, 2011)

  • Address
    2 Goi Kaigan, Ichihara, Chiba
  • Start-up
    February 1963
  • Total area
    1,168,766m2
  • Employees
    393
  • Capacity
    220,000barrels/day
  • ISO 9001
    December 25, 1996
  • ISO 14001
    March 13, 1998

CHIBA

Site Area
North Area 676,200
South Area 492,500
Capacity of Major Equipment
No.1 Topping Unit 100,000 barrels / day
New Vacuum Distillation Unit 20,000 barrels / day
No.2 Topping Unit 120,000 barrels / day
No.2 Vacuum Distillation Unit 60,000 barrels / day
Prefractionator Unit 23,000 barrels / day
No.1 Catalytic Reforming Unit 11,500 barrels / day
No.1 Reformate Splitter 9,000 barrels / day
No.2 Catalytic Reforming Unit 25,000 barrels / day
No.2 Reformate Splitter 20,000 barrels / day
Fluid Catalytic Cracking Unit 40,000 barrels / day
FCCGasoline Hydrodesulfurization Unit 24,000 barrels / day
No.1 Hydrodesulfurization Unit 8,000 barrels / day
Isomerization Unit 6,000 barrels / day
No.2 Hydrodesulfurization 26,000 barrels / day
No.3 Hydrodesulfurization 55,000 barrels / day
No.4 Hydrodesulfurization Unit 50,000 barrels / day
Vacuum Gas Oil Hydrodesulfurization Unit 35,000 barrels / day
Hydrogen Recovery by Membranes Separation System Unit 2units 643,200 m3N / day
No.10 Fuel Oil Hydrodesulfurization Unit 36,000 barrels / day
No.20 Fuel Oil Hydrodesulfurization Unit 36,000 barrels / day
No.1 Hydrogen Producing Unit 648,000 m3N / day
No.10·20 Hydrogen Producing Unit 880,000 m3N / day×2
Sulfur Recovery Unit
(With Tail Gas Treating Unit)
150 t / day×3
Blown Asphalt Unit 3,600 t / month
Power Facilities
Boilers 3units 323t / hour
Steam Turbine Generator 4units 26,600kW
Co-generation Unit   39,500kW
Oil Storage Facilities
Crude Oil Tanks 13units 930,500kl
Finished Product /
Semi-processed Product Tanks
109units 1,300,300kl
Lubricating Oil Tanks 66units 23,800kl
Sulfur Tanks 2units 13,200kl
Asphalt Tanks 20units 28,000kl
LPGTanks 25units 55,100kl
Port Facilities
Crude Oil Tanker Berth 1unit 100,000DWT
Keiyo Sea Berth 1unit 314,250DWT
Loading/Unloading Piersc 26units  